Garuda Indonesia Develop Bali as Main Cargo Hub

Apr. 16, 2018 by

Airlines of PT Garuda Indonesia (Persero) Tbk. will develop Ngurah Rai Airport in Denpasar, Bali, to become one of the main cargo hubs. President Director of Garuda Indonesia Pahala Mansury

Development of Ngurah Rai Airport in Bali Will Be Completed September 2018

Apr. 5, 2018 by

JAKARTA – PT Angkasa Pura I (Persero) is optimistic that the development project of Airport I Gusti Ngurah Rai in Bali can be completed in September 2018. Corporate Secretary of

AP II Ready to Incentives to Encourage International Routes Addition

Mar. 27, 2018 by

TANGERANG – PT Angkasa Pura II (Persero) admitted ready to provide a number of incentives for the addition of international routes can be realized. The Director of Engineering and Operations

Types Of Air Freight Services

Mar. 22, 2018 by

Furniture removal is an essential service when moving to a new place that may require air freight transport. The services required to send certain goods via air transport has varying

Saab Runway Operating System at Juanda International Airport

Mar. 13, 2018 by

The Saab Advanced-Surface Movement Guidance and Control System (A-SMGCS) is now operating at Juanda International Airport, Surabaya. The placement of Saab A-SMGCS at Juanda International Airport as the third largest

Air Cargo Business Predicted Up by 2018

Mar. 13, 2018 by

The domestic air cargo business prospect in 2018 is predicted to rise 8-10% from the previous year. Perpetrators of courier services that began to reach the remote areas to support.

Polemic of North Bali Airport: This Reason North Bali Airport Has Not Been Amdal

Mar. 9, 2018 by

DENPASAR- PT Bali International Airport North Bumi Panji Sakti stated until now has not made an Amdal study related to the location of the airport. That is because it is

Polemic of North Bali Airport: North Bali Airport Needs to be Addressed at President’s Level

Mar. 9, 2018 by

JAKARTA – Aviation observers assess the discussion of the construction project of North Bali International Airport should be completed through a limited meeting with the President. Arista Indonesia Aviation Center

Polemic North Bali Airport: Still Rearranged, North Bali Airport Can not Continue

Mar. 7, 2018 by

Based on a study from the World Bank and PT Sarana Multi Infrastruktur (Persero) (SMI), the construction of the Airport (Airport) of North Bali can not be implemented. However, the

Polemic of North Bali Airport: Minister of Transportation and Coordinating Minister for the Economy Not Synergistic

Mar. 7, 2018 by

Member of Commission V of DPR RI Gerindra M faction Nizar Zahro asked the Ministry of Transport to review the existing strategic plan (renstra) related to the construction of North